
The project is located in Zhoushan and is part of the National Reserve Materials Depot. It primarily involves the construction of immersed tube gravel piles with diameters of 800-1000 mm and lengths of 30-40 meters. The construction efficiency is significantly higher compared to using vibroflotation methods.

Our professional team will reply you as soon as possible.